A façade upgrade at a Crown Heights school: a large front window removed and the opening rebuilt with metal framing, DensGlass sheathing, waterproofing and insulation, finished in California stucco outside and new Sheetrock inside.
Project overview
Work included: Sidewalk bridge & scaffolding · Large window removal · Metal framing · DensGlass sheathing, waterproofing & insulation · California stucco · Interior insulation, Sheetrock & paint.
The result is a new insulated wall in the old window opening, finished in stucco outside and Sheetrock inside.
How it came together

Step 01 Window out
Scaffolding up and the old window removed.

Step 02 Metal framing
New metal framing in the opening.

Step 03 Sheathing
DensGlass sheathing, sealed at the joints.

Step 04 Stucco prep
New wall ready for stucco.
Project gallery























In their words
Here is how the school administration describes the result.
“Albatros rebuilt our large front window opening with new framing, sheathing, waterproofing and insulation, and finished the façade in stucco. The work was well organized and safe around our building.”
More commercial

Hunts Point, Bronx

Upper West Side, Manhattan

East New York, Brooklyn
Free estimate
Send a few details and we’ll call you back to schedule a free on-site estimate at a time that works for you.
Prefer to talk? Call us(718) 688-1919